RISK ASSESSMENTS

 While production there are  great chances of multiple risks and stakes. Some risks for us included :




-RISK: mishandling of expensive equipment

RISK LEVEL:4 

while filming the slider movement on the skateboard in the bathroom on slippery tiles thecamera and tripod were both at a risk of falling 

SOLUTION: using a moveable carriage for the camera   


-RISK: covid 19

RISK LEVEL; 5

due to the rapid growth of covid cases in our country we had to be careful about sops

SOLUTION: wear masks and make sure the whole crew is vaccinated 


RISK: time management 

RISK LEVEL:2

since our location was at a 30 minute drive we had to carefully utilize our time 

SOLUTION: reach the location on time and manage time efficiently


Other than these risks there were no other hazards as we filmed in a very safe and cautious environment 

 

Comments

Popular Posts