RISK ASSESSMENTS
While production there are great chances of multiple risks and stakes. Some risks for us included :
RISK LEVEL:4
while filming the slider movement on the skateboard in the bathroom on slippery tiles thecamera and tripod were both at a risk of falling
SOLUTION: using a moveable carriage for the camera
-RISK: covid 19
RISK LEVEL; 5
due to the rapid growth of covid cases in our country we had to be careful about sops
SOLUTION: wear masks and make sure the whole crew is vaccinated
RISK: time management
RISK LEVEL:2
since our location was at a 30 minute drive we had to carefully utilize our time
SOLUTION: reach the location on time and manage time efficiently
Other than these risks there were no other hazards as we filmed in a very safe and cautious environment
Comments
Post a Comment